How To Install The Slurry Pump Correctly

1. Reminder

1) It must be ensured that the direction of rotation of the slurry pump is consistent with the direction indicated by the arrow on the bracket. The motor must be completely disconnected from the pump during trial rotation. It is strictly forbidden for the motor to drive the pump shaft to rotate in the opposite direction, otherwise it will cause damage to the parts.

2) For pumps with packing seals, packing must be added as required before driving.

3) Pumps with mechanical seals must ensure the supply of shaft seal water. It is strictly forbidden to run without water, otherwise the mechanical seal will be burnt out.

4) For pumps with thin oil lubrication, add oil according to the oil level line of the oil standard before starting the pump. It is strictly forbidden to drive without oil, otherwise, the bearing will be burnt out.

2. Installation

1) Check before installation

The pump has been inspected and tested before leaving the factory. To ensure that it is in good working condition, it must be installed correctly. The installation should first check whether the model and parameters of the equipment are correct according to the "packing list", whether the parts are complete and intact, and whether the technical data and quality certificates carried with the machine are complete. After verifying that it is correct, you should read the relevant technical materials in detail and master the relevant technical requirements and operating essentials before proceeding with the installation. Avoid blind operation.

2) Installation and alignment of the pump

The horizontal pump unit should be installed using the secondary grouting method. After installation, the centerline of the unit should be consistent with the centerline of the foundation; the deviation of the center of the unit above the design value should be no more than +/-2mm, and the horizontal tolerance of the unit should be 0.1/1000.

For belt-driven pump units, the parallelism between the pump shaft and the motor shaft should be ensured, and the belt pulley is usually used for alignment. If the center distance is small, you can use a straightedge to align it against the end face of the flat pulley.

3) Configuration requirements for the inlet and outlet pipe sections of the slurry pump

The diameter of the suction pipe should be the same as the inlet diameter of the pump or slightly larger than the inlet diameter of the pump. The principle is to avoid cavitation caused by the pump and to prevent the slurry from forming deposits in the pipeline. A telescopic joint should be provided between the suction port of the pump and the suction pipe to facilitate the disassembly and assembly of the pump.

The diameter of the discharge outlet pipe is related to the sedimentation flow rate of the slurry properties. Generally, the discharge pipe diameter should be equal to or slightly larger than the outlet diameter of the pump. The outlet gate valve should have the same diameter as the discharge pipe. The pressure gauge is located on the straight pipe section between the pump outlet and the first valve.